瑞士
瑞士

myGeobrugg

Beaver Creek - Canal Protection

水利工程 - Beaver Creek - Canal Protection 2024

The mesh in the ditch allows the beavers to continue living in their habitat along the creek while protecting the dam.

水利工程 - Beaver Creek - Canal Protection 2024

The first step was to create a 1.5-meter-deep trench along the base of the dam. The mesh was then placed in the trench.

水利工程 - Beaver Creek - Canal Protection 2024

After the mesh was installed, the trench was backfilled and re-vegetated.

 
 

系统长度

2200 m

 

安装年份:

2024

情况:

Beavers inhabit a creek that runs along a dike. Their digging activities had endangered the dike’s stability in several places.

描述

To ensure the dam’s stability, the beavers’ activities had to be restricted, and existing passages had to be filled in. For this reason, mesh (DELTAX G80/2 STAINLESS) was vertically integrated into the dam at a depth of 1.30 meters. This still allows beavers to create burrows in front of the sealed-off area and maintain their habitat. So, the dam body behind the mesh doesn't protect it.

国家/地区

荷兰

客户

Geobenelux

防护对象

Infrastructure, Other, Riverbank

腐蚀保护:

INOX / STAINLESS

本地联系方式

René Müller
   

René Müller

Country Manager Western Switzerland

自然災害防護
Hydraulic Engineering
矿井/隧道
Monitoring
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Western Switzerland

联系地址

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

自然災害防護
Hydraulic Engineering
矿井/隧道
Monitoring
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

联系地址

Felix Nowak
 

Felix Nowak

Hydraulic Engineering
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

自然災害防護
Hydraulic Engineering
矿井/隧道
Monitoring
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / 瑞士 Country Manager Southern Switzerland

联系地址