瑞士
瑞士

myGeobrugg

边坡稳定 - Cartagena Viaduct 2023

Rock block separating the bridge - stabilized with steel-wire mesh and spike plates

边坡稳定 - Cartagena Viaduct 2023

SPIDER® S3-130 mesh and spike plates

边坡稳定 - Cartagena Viaduct 2023

Re-vegetation at the foot of the rock

 
 

安装年份:

2023

情况:

The G-94-F highway links Cartagena with other cities on the central coast of Chile. The highway passes an over 40-meter-high bridge. A rock separates the two lanes of the bridge. This large rock fractured, and the gap began to expand, threatening the infrastructure and, thus, the connection between the cities.

The company GESVIAL is responsible for keeping the rock stable and the road safe by installing a stabilization system to stop the expansion of the opening.

描述

Today, the SPIDER® S3-130 system is stabilizing the rock. 
The rock’s volume is 18 cubic meters and weighs about 50 tons. It appears stable and sound, with a 10 mm crack opening and an inclination angle of 45°. The rock has not shown movements.

The system was installed with drilling anchors, spike plates, cable anchors, steel cables, and connection accessories.

国家/地区

智利

客户

防护对象

Road

腐蚀保护:

GEOBRUGG SUPERCOATING

本地联系方式

René Müller
   

René Müller

Country Manager Western Switzerland

自然災害防護
Hydraulic Engineering
矿井/隧道
Monitoring
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Western Switzerland

联系地址

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

自然災害防護
Hydraulic Engineering
矿井/隧道
Monitoring
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

自然災害防護
Hydraulic Engineering
矿井/隧道
Monitoring
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / 瑞士 Country Manager Southern Switzerland

联系地址