瑞士
瑞士

myGeobrugg

边坡稳定 - Cwmavon Landslide 2018

Completed site image from the south of site.

边坡稳定 - Cwmavon Landslide 2018

Slope after failure and cleaning

边坡稳定 - Cwmavon Landslide 2018

Site after tree clearance

边坡稳定 - Cwmavon Landslide 2018

Installation from top down of TECCO® GREEN

边坡稳定 - Cwmavon Landslide 2018

Skid drill rig installing soil nails

边坡稳定 - Cwmavon Landslide 2018

View of the full site including mobile elevated work platform (MEWP)

边坡稳定 - Cwmavon Landslide 2018

Image from the north of site, showing the contouring of the mesh

边坡稳定 - Cwmavon Landslide 2018

Natural vegetation regrowth through the TECCO® GREEN

边坡稳定 - Cwmavon Landslide 2018

Boundary ropes and vegetation growth

 
 

安装年份:

2018

情况:

After prolonged periods of heavy rain and strong winds a large quantity of material was mobilised from the slope down onto the B4286. The road was closed for safety concerns whilst any remaining material was removed by hand. Traffic management was then installed and the road was re-opened as a single lane under traffic management.

Working closely with the local borough council, Geotechnical contractor Quantum Geotechnical and specialist rope access teams at iBEX a provisional stabilisation solution was put forward. This stabilisation utilised the excellent properties of TECCO® GREEN for both strength and greening capabilities. Quantum Geotechnical employed Remedy Geotechnics to ensure the provisional design was suitable, and all was agreed.

地質學

Brithdir Member - Sandstone. Sedimentary Bedrock formed approximately 308 to 310 million years ago in the Carboniferous Period.

These sedimentary rocks are fluvial in origin. They are detrital, ranging from course- to fine-grained and form beds and lenses of deposits reflecting the channels, Floodplains, and levees of a river.

描述

After harvesting of all trees on the full slope and specialist removal of tree stumps and roots on the slip plane, drilling works started from top down. In total 19 rolls of TECCO® GREEN, were installed with 150 soil nails.

国家/地区

英国

客户

Neath Port Talbot county borough council

工程:

Remedy Geotechnics

承包商:

Quantum Geotechnical

分包商:

iBEX technical access

防护对象

Road, Residential area, Infrastructure

腐蚀保护:

GEOBRUGG SUPERCOATING

本地联系方式

René Müller
   

René Müller

Country Manager Western Switzerland

自然災害防護
Hydraulic Engineering
矿井/隧道
Monitoring
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Western Switzerland

联系地址

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

自然災害防護
Hydraulic Engineering
矿井/隧道
Monitoring
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

自然災害防護
Hydraulic Engineering
矿井/隧道
Monitoring
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / 瑞士 Country Manager Southern Switzerland

联系地址