落石防护 - Gäsi cycling path 2023

Connection to the highway gallery (special solution)

落石防护 - Gäsi cycling path 2023

During installation of the canopy

落石防护 - Gäsi cycling path 2023

View from the roof of the highway gallery

落石防护 - Gäsi cycling path 2023

Covered bike path with highway gallery and rockface in the background

落石防护 - Gäsi cycling path 2023

View of new almost 300 meters long canopy with Lake Walen and the vertical rock face

 

系统

 

系统长度

- 296 m

 

安装年份:

2023

情况:

The cycle path along the southern shore of Lake Walen is threatened by falling rocks. An official hiking trail also runs alongside the bike path. So there are also a lot of pedestrians on the trail. The most dangerous sections are between Ofenegg and the Weisswand tunnel. This section is around 500 metres long. The main primary fall zones are the dozens of metre-high rock faces directly above the cycle path, as well as various rocky strips in the overlying steep forest.

描述

A self-cleaning roof of mesh protects the cycling track: impacts up to 1000 kJ for stones and blocks, self-cleaning up to 500 kJ).

A special construction was used to attach part of the net roof to the highway gallery. Almost 300 meters long, it is currently (as of 2023) the longest net construction in Europe.

国家/地区

瑞士

客户

Kanton Glarus

防护对象

Road, Touristic infrastructure

腐蚀保护:

GEOBRUGG SUPERCOATING

本地联系方式

René Müller
   

René Müller

Country Manager Western Switzerland

自然災害防護
Hydraulic Engineering
矿井/隧道
Monitoring
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Western Switzerland

联系地址

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

自然災害防護
Hydraulic Engineering
矿井/隧道
Monitoring
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

自然災害防護
Hydraulic Engineering
矿井/隧道
Monitoring
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / 瑞士 Country Manager Southern Switzerland

联系地址