瑞士
瑞士

myGeobrugg

Huasco Valley - Emergency construction Route 489 and Route 495

边坡稳定 - Huasco Valley - Emergency construction Route 489 and Route 495 2018

Route 495

边坡稳定 - Huasco Valley - Emergency construction Route 489 and Route 495 2018

Route 489

边坡稳定 - Huasco Valley - Emergency construction Route 489 and Route 495 2018

Route 495

边坡稳定 - Huasco Valley - Emergency construction Route 489 and Route 495 2018

Route 489

边坡稳定 - Huasco Valley - Emergency construction Route 489 and Route 495 2018

Route 495

边坡稳定 - Huasco Valley - Emergency construction Route 489 and Route 495 2018

QUAROX® with secondary mesh DELTAX®

 
 

安装年份:

2018

情况:

In 2017, after alluvial events, rockfalls threatened the C489. This route goes from Alto del Carmen and San Felix to the Route 495 between Alto del Carmen and El Transito in the III Region of Atacama.

The Ministry of public works MOP initiated the contract for the conservation of the route and the reduction of the potential risk. It meant to improve slopes, the construction of bridges and general the maintenance of both roads.

The measures had to ensure the safety of the users of the route, most of them working in agriculture in the Huasco Valley. 

描述

Geobrugg evaluated the slopes and recommended a rockfall protection with QUAROX® and DELTAX® mesh. The installation guides falling rocks towards the base of the slope where there is easy access for cleaning.

Details:
Route 489 - IMACO: km10 - km 13
Routa 495 - SICOMAQ : km 22

国家/地区

智利

客户

MOP Atacama

工程:

Geobrugg Andina

承包商:

IMACO Ruta C489 / SICOMAQ Ruta C495

防护对象

Road, Touristic infrastructure

腐蚀保护:

GEOBRUGG SUPERCOATING

本地联系方式

René Müller
   

René Müller

Country Manager Western Switzerland

自然災害防護
Hydraulic Engineering
矿井/隧道
Monitoring
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Western Switzerland

联系地址

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

自然災害防護
Hydraulic Engineering
矿井/隧道
Monitoring
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

自然災害防護
Hydraulic Engineering
矿井/隧道
Monitoring
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / 瑞士 Country Manager Southern Switzerland

联系地址