安装年份:

2013

情况:

During the construction of a bypass, the granite slope on federal highway B 28 between Oberkirch and Lautenbach was steepened to an angle of 60 degrees and a height of 30 meters. The slope was covered by approx. 1.5 m of scree and needed stabilization.

描述

To get all-time access and to balance forces, two berms of 3 meter width were implanted. Our slope stabilization system TECCO® was installed throughout the slope under the natural covering. The Tecmat grass seed mat ensures quick revegetation and rooting of the seeds. The slope is densely revegetated one year after the installation.

国家/地区

德国

客户

Regional Council Freiburg

工程:

Prof. Dr.-Ing. Heinrich Bechert + Partner

承包商:

Schleith GmbH

分包商:

Landeck GmbH

防护对象

Road

腐蚀保护:

GEOBRUGG SUPERCOATING

本地联系方式

René Müller
   

René Müller

Country Manager Western Switzerland

自然災害防護
Hydraulic Engineering
矿井/隧道
Monitoring
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Western Switzerland

联系地址

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

自然災害防護
Hydraulic Engineering
矿井/隧道
Monitoring
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

自然災害防護
Hydraulic Engineering
矿井/隧道
Monitoring
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / 瑞士 Country Manager Southern Switzerland

联系地址