瑞士
瑞士

myGeobrugg

边坡稳定 - T-350 Road   Valdivia 2015

Four years after installation

边坡稳定 - T-350 Road   Valdivia 2015

After the landslide in 2013

边坡稳定 - T-350 Road   Valdivia 2015

Installation works on the slope

边坡稳定 - T-350 Road   Valdivia 2015

View down on slope stabilization with TECCO® System

边坡稳定 - T-350 Road   Valdivia 2015

Slope stabilization with TECCO® and TECMAT®

边坡稳定 - T-350 Road   Valdivia 2015

View upslope

边坡稳定 - T-350 Road   Valdivia 2015

Revegetated embankment in 2018

边坡稳定 - T-350 Road   Valdivia 2015

Green covering the slope in 2018

 
 

安装年份:

2015

情况:

At the end of 2013 a major collapse of the slope interrupted traffic on the transit route T350 that connects the city of Valdivia with Niebla.  The slope failure alerted authorities of the region. A sustainable protection of the road had to be found.

描述

Geobrugg and MOP authorities proposed a slope stabilization with TECCO® System (soil nailing), combined with the TECMAT® erosion control mat for the greening of the embankment. Since then the stability of the sector is given and traffic never again had to be interrupted slope failures.

国家/地区

智利

客户

Ministerio de Obras Públicas - Región de los Ríos

工程:

Ministerio de Obras Públicas - Región de los Ríos

承包商:

Constructora Socal

防护对象

Road

本地联系方式

René Müller
   

René Müller

Country Manager Western Switzerland

自然災害防護
Hydraulic Engineering
矿井/隧道
Monitoring
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Western Switzerland

联系地址

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

自然災害防護
Hydraulic Engineering
矿井/隧道
Monitoring
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

自然災害防護
Hydraulic Engineering
矿井/隧道
Monitoring
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / 瑞士 Country Manager Southern Switzerland

联系地址