瑞士
瑞士

myGeobrugg

落石防护 - Ujsoły 2021

Rockfall barrier protecting the road and its users

落石防护 - Ujsoły 2021

Detachment zone at the top of the slope

落石防护 - Ujsoły 2021

GBE-500A barrier after completed installation

落石防护 - Ujsoły 2021

GBE-500A barrier protecting the road against rockfall

 

系统

 

系统长度

410 m

 

安装年份:

2021

情况:

Ujsoły is located in the south of Poland, not far from Żywiec. A couple of years ago, rockfall led to the closure of the road  connecting Ujsoły to the Polish-Slovakian border. Since then, road users have been endangered by rockfalls and rocks remaining on the road in this section.

描述

To protect users and the road as an infrastructure against rockfalls, three GBE-500A rockfall barriers have been put in place. The barrier line protects the road for a total length of 410 meters. This solution keeps the road open and enhances safety during travels along the route.

 

国家/地区

波兰

工程:

Tokbud Tokarek Krzysztof

承包商:

防护对象

Road

腐蚀保护:

GEOBRUGG SUPERCOATING

本地联系方式

René Müller
   

René Müller

Country Manager Western Switzerland

自然災害防護
Hydraulic Engineering
矿井/隧道
Monitoring
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Western Switzerland

联系地址

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

自然災害防護
Hydraulic Engineering
矿井/隧道
Monitoring
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

自然災害防護
Hydraulic Engineering
矿井/隧道
Monitoring
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / 瑞士 Country Manager Southern Switzerland

联系地址