Schweiz
Schweiz

myGeobrugg

Böschungsstabilisierung - Palena 2003

.

Böschungsstabilisierung - Palena 2003

Ankerplatte

Böschungsstabilisierung - Palena 2003

Details of the TECCO® mesh

Böschungsstabilisierung - Palena 2003

Location of the bank at the completion of works

Böschungsstabilisierung - Palena 2003

Stabilized bank with the TECCO® mesh

Böschungsstabilisierung - Palena 2003

Bank revegetation

Böschungsstabilisierung - Palena 2003

Details of the revegetated bank

Böschungsstabilisierung - Palena 2003

Condition of the bank after the flow surges

Böschungsstabilisierung - Palena 2003

System drawing

 

Installationsjahr

2003

Situation

The stretch of embankment in question was long since subject to erosion problems because of the presence of nonlinear stretches in correspondence with the material removal, in case of signifi cant fl ows. This involved problems of poor stability for the road above and for the buildings that were immediately behind.

Massnahme

The TECCO® choice by the design engineer was made for various reasons of which we should mention the high-tensile steel wire TECCO® mesh unit (high tensile 1770 N/mm2); the special anticorrosive treatment with aluminium-zinc alloy (GEOBRUGG SUPERCOATING); and the high bearing resistance of the mesh, by applying tension to it with the penetration of the special TECCO® cuspate shaped plates for the distribution of the anchorage loads in the bank's soil. These elements guaranteed by the TECCO® System are not present in the traditional bank protection method with gabions. Furthermore, the
particularly fast timeline for the implementation of the TECCO® System played a major part given that the work was done late in the season.

Land/Region

Italien

Kunde

Municipality of Palena

Planer

Dr. Ing. Alessandro Marini

Generalunternehmer

CO.GE.PRI. srl - PIaneta Montagna

Geschützte Objekte

Strasse, Gebäude

Ansprechpartner

René Müller
   

René Müller

Country Manager Western Switzerland

Naturgefahren
Uferschutz/Wasserbau
Minen / Bergbau / Tunnel
Fernüberwachung
Geobrugg AG,Industriestrasse 21,5200 Brugg / Schweiz Country Manager Western Switzerland

E-Mail

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

Naturgefahren
Uferschutz/Wasserbau
Minen / Bergbau / Tunnel
Fernüberwachung
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

Naturgefahren
Uferschutz/Wasserbau
Minen / Bergbau / Tunnel
Fernüberwachung
Geobrugg AG,Via Brusada 5,6933 Muzzano / Schweiz Country Manager Southern Switzerland

E-Mail