Suisse
Suisse

myGeobrugg

Huasco Valley - Emergency construction Route 489 and Route 495

Stabilisation des pentes - Huasco Valley - Emergency construction Route 489 and Route 495 2018

Route 495

Stabilisation des pentes - Huasco Valley - Emergency construction Route 489 and Route 495 2018

Route 489

Stabilisation des pentes - Huasco Valley - Emergency construction Route 489 and Route 495 2018

Route 495

Stabilisation des pentes - Huasco Valley - Emergency construction Route 489 and Route 495 2018

Route 489

Stabilisation des pentes - Huasco Valley - Emergency construction Route 489 and Route 495 2018

Route 495

Stabilisation des pentes - Huasco Valley - Emergency construction Route 489 and Route 495 2018

QUAROX® with secondary mesh DELTAX®

 
 

Année d’installation

2018

Situation

In 2017, after alluvial events, rockfalls threatened the C489. This route goes from Alto del Carmen and San Felix to the Route 495 between Alto del Carmen and El Transito in the III Region of Atacama.

The Ministry of public works MOP initiated the contract for the conservation of the route and the reduction of the potential risk. It meant to improve slopes, the construction of bridges and general the maintenance of both roads.

The measures had to ensure the safety of the users of the route, most of them working in agriculture in the Huasco Valley. 

Description

Geobrugg evaluated the slopes and recommended a rockfall protection with QUAROX® and DELTAX® mesh. The installation guides falling rocks towards the base of the slope where there is easy access for cleaning.

Details:
Route 489 - IMACO: km10 - km 13
Routa 495 - SICOMAQ : km 22

Pays / région

Chili

Client

MOP Atacama

Ingénierie

Geobrugg Andina

Entrepreneur

IMACO Ruta C489 / SICOMAQ Ruta C495

Objet protégé

Route/Rue, Infrastructure touristique

Protection anticorrosion

GEOBRUGG SUPERCOATING

Votre contact local

René Müller
   

René Müller

Country Manager Cantons AG BE BL BS FR GE JU NE SO VD VS

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Système de surveillance d'ouvrage à distance
Geobrugg AG,Industriestrasse 21,5200 Brugg / Suisse Country Manager Cantons AG BE BL BS FR GE JU NE SO VD VS

E-mail

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Système de surveillance d'ouvrage à distance
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Système de surveillance d'ouvrage à distance
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / Suisse Country Manager Southern Switzerland

E-mail