Hydroelectric Power Plant Tunnel

Exploitation minière / Tunnel - Hydroelectric Power Plant Tunnel 2014

Mechanized installation process with MESHA® on Sandvik equipment

Exploitation minière / Tunnel - Hydroelectric Power Plant Tunnel 2014

MINAX® 80/4 installed with standard plates. Thanks to knotted mesh ends, rockbolts installed in the last opening are not problematic.

Exploitation minière / Tunnel - Hydroelectric Power Plant Tunnel 2014

Rockburst problem during constrution of the headrace tunnel - it is clear the the ground support structure had to be reinforced

Exploitation minière / Tunnel - Hydroelectric Power Plant Tunnel 2014

Mechanized installation process with the MESHA® handler

Exploitation minière / Tunnel - Hydroelectric Power Plant Tunnel 2014

Jumbo equipped with MESHA® handler on the way to the tunnel front

 
 

Année d’installation

2014

Situation

During construction of the headrace tunnel in July 2012 for a hydro power plant some severe rockburst occured. The high internal stress in the rock and overburden over 1000 m on top of the tunnel as well as the brittle metamophic character with a rock mass rating RMR › 65 caused some severe problems during the project.

Description

The tunnel was divided in sectors to analyse the stress level in regard to the high stress classification whereas it shows that some rockbursts of level 2 and 3 occured. In the most critical zone a support system with MINAX® 80/4 was applied in combination with mechanized installation thanks to Geobrugg's MESHA® handler. The installation time had been decreased between 20 to 25% and safety for workes was significantly improved.

Pays / région

Pérou

Client

-

Objet protégé

Autres

Protection anticorrosion

GEOBRUGG SUPERCOATING

Votre contact local

René Müller
   

René Müller

Country Manager Cantons AG BE BL BS FR GE JU NE SO VD VS

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Système de surveillance d'ouvrage à distance
Geobrugg AG,Industriestrasse 21,5200 Brugg / Suisse Country Manager Cantons AG BE BL BS FR GE JU NE SO VD VS

E-mail

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Système de surveillance d'ouvrage à distance
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Système de surveillance d'ouvrage à distance
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / Suisse Country Manager Southern Switzerland

E-mail