Suíça
Suíça

myGeobrugg

Hydroelectric Power Plant Tunnel

Mineração / Túneis - Hydroelectric Power Plant Tunnel 2014

Mechanized installation process with MESHA® on Sandvik equipment

Mineração / Túneis - Hydroelectric Power Plant Tunnel 2014

MINAX® 80/4 installed with standard plates. Thanks to knotted mesh ends, rockbolts installed in the last opening are not problematic.

Mineração / Túneis - Hydroelectric Power Plant Tunnel 2014

Rockburst problem during constrution of the headrace tunnel - it is clear the the ground support structure had to be reinforced

Mineração / Túneis - Hydroelectric Power Plant Tunnel 2014

Mechanized installation process with the MESHA® handler

Mineração / Túneis - Hydroelectric Power Plant Tunnel 2014

Jumbo equipped with MESHA® handler on the way to the tunnel front

 
 

Ano de instalação:

2014

Situação:

During construction of the headrace tunnel in July 2012 for a hydro power plant some severe rockburst occured. The high internal stress in the rock and overburden over 1000 m on top of the tunnel as well as the brittle metamophic character with a rock mass rating RMR › 65 caused some severe problems during the project.

Descrição:

The tunnel was divided in sectors to analyse the stress level in regard to the high stress classification whereas it shows that some rockbursts of level 2 and 3 occured. In the most critical zone a support system with MINAX® 80/4 was applied in combination with mechanized installation thanks to Geobrugg's MESHA® handler. The installation time had been decreased between 20 to 25% and safety for workes was significantly improved.

País / Região:

Peru

Cliente:

-

Objecto protegido:

Outros

Protecção contra a corrosão:

GEOBRUGG SUPERCOATING

O seu contacto local

René Müller
   

René Müller

Country Manager Western Switzerland

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Monitoring
Geobrugg AG,Industriestrasse 21,5200 Brugg / Suíça Country Manager Western Switzerland

E-mail

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Monitoring
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Monitoring
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / Suíça Country Manager Southern Switzerland

E-mail