In 2011, a feasibility study was conducted into rerouting the road. In 2014, the Austrian state of Voralberg began the construction of five hairpin bends with a length of 1.3 km and at a cost of ar
Il progettista ha deciso di utilizzare la treccia TECCO® G65/3 ad alta resistenza grazie alle sue proprietà uniche di sistema, ai bassi requisiti di manutenzione e alla protezione anticorrosione. I...