 - Muriwai Drive 2019

Looking east up the property - note pressure post and undulating allignment

 - Muriwai Drive 2019

Close up of post base - note drag net and proximity to property boundary

 - Muriwai Drive 2019

Looking north - fence allignment and gap fill kit

 
 

System length

16 m

 

Year of installation

2019

Situation

A rock and tree fall hazard on an existing property created the requirement for a custom rockfall barrier. The site was narrow (17 m wide), had difficult access and no flat alignments.

Description

The system selected was a 16 m long, 3 m high GBE-1000A-R with pressure posts, drag nets and a gap fill kit.
Below is a list of custom features:

Fixed Post -  no upslope anchors due to proximity of alignment to property boundary
Pressure Posts - no lateral anchors meant barrier could be installed over full property width
Drag Nets - enabled the shorter barrier to have the required deflection to absorb the 1000 kJ energy event
Gap Fill Kit - enabled the  barrier to contour the difficult alignment

Country/Region

ニュージーランド

Customer

Private

Contractor

Rock Control, www.rockcontrol.co.nz

Protected object

建築

Corrosion protection

ジェオブルッグ スーパーコーティング, ジェオブルッグ ウルトラコーティング

Your local contact

René Müller
   

René Müller

Country Manager Western Switzerland

自然災害防護
Hydraulic Engineering
鉱山/トンネル
モニタリングサービス
Geobrugg AG,Industriestrasse 21,5200 Brugg / スイス Country Manager Western Switzerland

E-Mail

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

自然災害防護
Hydraulic Engineering
鉱山/トンネル
モニタリングサービス
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

自然災害防護
Hydraulic Engineering
鉱山/トンネル
モニタリングサービス
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / スイス Country Manager Southern Switzerland

E-Mail