스위스
스위스

myGeobrugg

낙석방호시스템 - Muriwai Drive 2019

Looking east up the property - note pressure post and undulating allignment

낙석방호시스템 - Muriwai Drive 2019

Close up of post base - note drag net and proximity to property boundary

낙석방호시스템 - Muriwai Drive 2019

Looking north - fence allignment and gap fill kit

 
 

시스템 길이

16 m

 

설치 년도

2019

Situation

A rock and tree fall hazard on an existing property created the requirement for a custom rockfall barrier. The site was narrow (17 m wide), had difficult access and no flat alignments.

Description

The system selected was a 16 m long, 3 m high GBE-1000A-R with pressure posts, drag nets and a gap fill kit.
Below is a list of custom features:

Fixed Post -  no upslope anchors due to proximity of alignment to property boundary
Pressure Posts - no lateral anchors meant barrier could be installed over full property width
Drag Nets - enabled the shorter barrier to have the required deflection to absorb the 1000 kJ energy event
Gap Fill Kit - enabled the  barrier to contour the difficult alignment

Country/Region

뉴질랜드

Customer

Private

Contractor

Rock Control, www.rockcontrol.co.nz

Protected object

Building

부식방지

GEOBRUGG SUPERCOATING, GEOBRUGG ULTRACOATING

Your local contact

René Müller
   

René Müller

Country Manager Western Switzerland

자연 재해
수리학
광산 / 터널
모니터링
Geobrugg AG,Industriestrasse 21,5200 Brugg / 스위스 Country Manager Western Switzerland

이메일

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

자연 재해
수리학
광산 / 터널
모니터링
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

이메일

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

자연 재해
수리학
광산 / 터널
모니터링
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / 스위스 Country Manager Southern Switzerland

이메일