スイス
スイス

myGeobrugg

 - Oberkirch-Lautenbach 2013

.

 - Oberkirch-Lautenbach 2013

.

 - Oberkirch-Lautenbach 2013

.

 - Oberkirch-Lautenbach 2013

.

 - Oberkirch-Lautenbach 2013

.

 - Oberkirch-Lautenbach 2013

.

 - Oberkirch-Lautenbach 2013

.

 - Oberkirch-Lautenbach 2013

.

 - Oberkirch-Lautenbach 2013

.

 - Oberkirch-Lautenbach 2013

.

 - Oberkirch-Lautenbach 2013

.

 
 

Year of installation

2013

Situation

During the construction of a bypass, the granite slope on federal highway B 28 between Oberkirch and Lautenbach was steepened to an angle of 60 degrees and a height of 30 meters. The slope was covered by approx. 1.5 m of scree and needed stabilization.

Description

To get all-time access and to balance forces, two berms of 3 meter width were implanted. Our slope stabilization system TECCO® was installed throughout the slope under the natural covering. The Tecmat grass seed mat ensures quick revegetation and rooting of the seeds. The slope is densely revegetated one year after the installation.

Country/Region

ドイツ

Customer

Regional Council Freiburg

Engineering

Prof. Dr.-Ing. Heinrich Bechert + Partner

Contractor

Schleith GmbH

Subcontractor

Landeck GmbH

Protected object

道路

Corrosion protection

ジェオブルッグ スーパーコーティング

Your local contact

René Müller
   

René Müller

Country Manager Western Switzerland

自然災害防護
Hydraulic Engineering
鉱山/トンネル
モニタリングサービス
Geobrugg AG,Industriestrasse 21,5200 Brugg / スイス Country Manager Western Switzerland

E-Mail

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

自然災害防護
Hydraulic Engineering
鉱山/トンネル
モニタリングサービス
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

自然災害防護
Hydraulic Engineering
鉱山/トンネル
モニタリングサービス
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / スイス Country Manager Southern Switzerland

E-Mail