스위스
스위스

myGeobrugg

Gamsgrubenweg, Grossglockner

낙석방호시스템 - Gamsgrubenweg, Grossglockner 2013

Placement of the damping modules on top of the rockfall gallery. Elements size is 0.95 m x 0.95 m x 1.3 m

낙석방호시스템 - Gamsgrubenweg, Grossglockner 2013

Cross-section of the rockfall protection gallery for hikers with ROCKFALL-X G on top as extra dumping layer

낙석방호시스템 - Gamsgrubenweg, Grossglockner 2013

Big Bags and in between filling with cellular glass before covering with a geotextile

낙석방호시스템 - Gamsgrubenweg, Grossglockner 2013

Filling of the gaps between ROCKFALL-X G bags with cellular glass

낙석방호시스템 - Gamsgrubenweg, Grossglockner 2013

Cover with a geotextile

 

Systems

 

설치 년도

2013

Situation

To protect from rockfall on an alpine trail at the mountain Grossglockner in Austria, a new rockfall gallery was built between two tunnels.

Description

The damping system ROCKFALL-X G was used on top of the gallery to economically dampen rockfall impacts with a calculated energy of up to 800 kJ. For this purpose 85 bags of the 1.3 m high damping modules were prepared in Geobrugg factory and delivered directly to the construction site.

Country/Region

오스트리아

Customer

Grossglockner Hochalpenstrassen AG

Engineering

Ingenieurbüro Tschernutter Consulting GmbH

Contractor

Felbermayr Bau GmbH

Protected object

Road

부식방지

GEOBRUGG SUPERCOATING

Your local contact

René Müller
   

René Müller

Country Manager Western Switzerland

자연 재해
수리학
광산 / 터널
모니터링
Geobrugg AG,Industriestrasse 21,5200 Brugg / 스위스 Country Manager Western Switzerland

이메일

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

자연 재해
수리학
광산 / 터널
모니터링
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

이메일

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

자연 재해
수리학
광산 / 터널
모니터링
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / 스위스 Country Manager Southern Switzerland

이메일