Швейцария
Швейцария

myGeobrugg

Renovation of the Mont Blanc Tunnel vault

Защита от осколков - Renovation of the Mont Blanc Tunnel vault 2024

The ROCKFALL-X A system absorbs rock falls from the vault over the entire width of the tunnel; the decking is easily cleared thanks to the metal plate installed at the top

Защита от осколков - Renovation of the Mont Blanc Tunnel vault 2024

The system consists of three layers of recycled tires, with layers of TECCO® G65/3 mesh between them

Защита от осколков - Renovation of the Mont Blanc Tunnel vault 2024

Metal plate on top of the ROCKFALL-X A system, covered with rocks

 

Год установки:

2024

Ситуация:

The Mont-Blanc Tunnel is 60 years old and one of Europe’s major tunnels, which needs renovation work to ensure its long-term survival. With this in mind, the first test phase of work in autumn 2024 determined the methodologies for future project phases. Renovation of the Mont-Blanc Tunnel vault will involve removing the existing lining, as the resulting boulder falls will bring too much energy to bear on the running slab and could damage it.

Описание:

Based on the data provided by Setec, we worked together to justify and supply a ROCKFALL-X A solution to cushion these falling boulders and protect the running slab. As the site was mobile and operated in a confined environment, the ROCKFALL-X A system was combined with a metal decking that could be drained and moved quickly by site machinery.

Страна/Регион:

Франция

Клиент:

Tunnel du Mont Blanc - GEIE

Проектировщик:

Setec

Подрядчик:

Spie Batignolles

Защищаемый объект:

Дорога, Kарьер / Шахта

Представитель в Вашем регионе

Ivo Naef
 

Ivo Naef

Director Industry Solutions

безопасность
Геобругг АГ,Аахштрассе 11,8590 Романсхорн / Швейцария Director Industry Solutions

Электронная почта