瑞士
瑞士

myGeobrugg

边坡稳定 - Cucuta Pamplona Hill 2015

Combination with active anchors

边坡稳定 - Cucuta Pamplona Hill 2015

Lateral view of the solution

边坡稳定 - Cucuta Pamplona Hill 2015

Combination with active anchors

边坡稳定 - Cucuta Pamplona Hill 2015

Front view of the slope

边坡稳定 - Cucuta Pamplona Hill 2015

Greening process

 
 

安装年份:

2015

情况:

The three critical slopes in the area of Cúcuta - Pamplona measure over 120 meters in height.


描述

The San Simón concession (the companies Fondo de Adaptacion and Latinoamericana de Construcciones), decided to implement 2'5000 m² of DELTAX and 4'725 m² of TECCO G65/3.

The mesh system was accompanied by an erosion control mantle covering in some cases active anchors that are installed to guarantee the global stability of the critical site.

国家/地区

哥伦比亚

客户

Fondo de Adaptacion

承包商:

Concesion San Simon

分包商:

Latinoamericana de construcciones

防护对象

Road

本地联系方式

René Müller
   

René Müller

Country Manager Western Switzerland

自然災害防護
Hydraulic Engineering
矿井/隧道
Monitoring
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Western Switzerland

联系地址

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

自然災害防護
Hydraulic Engineering
矿井/隧道
Monitoring
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

自然災害防護
Hydraulic Engineering
矿井/隧道
Monitoring
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / 瑞士 Country Manager Southern Switzerland

联系地址