Schweiz
Schweiz

myGeobrugg

Coquitlam-Bunzten Tunnel Gate Replacement

Steinschlagschutz - Coquitlam-Bunzten Tunnel Gate Replacement 2021

Protected tunnel portal

Steinschlagschutz - Coquitlam-Bunzten Tunnel Gate Replacement 2021

The rockfall barrier is unobtrusive, thus not disturbing the beautiful landscape

Steinschlagschutz - Coquitlam-Bunzten Tunnel Gate Replacement 2021

Above the portal, posts are 7m tall

Steinschlagschutz - Coquitlam-Bunzten Tunnel Gate Replacement 2021

The protected portal below the barrier

Steinschlagschutz - Coquitlam-Bunzten Tunnel Gate Replacement 2021

Rapid and successful implementation through teamwork - thanks to all involved!

 

Systemlänge

42 m

 

Installationsjahr

2021

Situation

RXE-2000 barrier system needed to be installed to protect a tunnel portal, lay down area,  ventilation, and power sources. Barrier protects equipment as well as infrastructure. 

Massnahme

Geobrugg delivered a 42m long, with 7m tall posts RXE-2000 Barrier at the end of December 2020. Project was completed, with great teamwork, January 2021.

Land/Region

Kanada

Kunde

Planer

Dr. Duncan Wyllie, P.Eng

Generalunternehmer

Geschützte Objekte

Steinbruch / Bergbau, Infrastruktur, Sonstige

Korrosionsschutz

Verzinkt, GEOBRUGG SUPERCOATING

Ansprechpartner

René Müller
   

René Müller

Country Manager Western Switzerland

Naturgefahren
Uferschutz/Wasserbau
Minen / Bergbau / Tunnel
Fernüberwachung
Geobrugg AG,Industriestrasse 21,5200 Brugg / Schweiz Country Manager Western Switzerland

E-Mail

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

Naturgefahren
Uferschutz/Wasserbau
Minen / Bergbau / Tunnel
Fernüberwachung
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

Naturgefahren
Uferschutz/Wasserbau
Minen / Bergbau / Tunnel
Fernüberwachung
Geobrugg AG,Via Brusada 5,6933 Muzzano / Schweiz Country Manager Southern Switzerland

E-Mail