落石防护 - Coquitlam-Bunzten Tunnel Gate Replacement 2021

Protected tunnel portal

落石防护 - Coquitlam-Bunzten Tunnel Gate Replacement 2021

The rockfall barrier is unobtrusive, thus not disturbing the beautiful landscape

落石防护 - Coquitlam-Bunzten Tunnel Gate Replacement 2021

Above the portal, posts are 7m tall

落石防护 - Coquitlam-Bunzten Tunnel Gate Replacement 2021

The protected portal below the barrier

落石防护 - Coquitlam-Bunzten Tunnel Gate Replacement 2021

Rapid and successful implementation through teamwork - thanks to all involved!

 

系统长度

42 m

 

安装年份:

2021

情况:

RXE-2000 barrier system needed to be installed to protect a tunnel portal, lay down area,  ventilation, and power sources. Barrier protects equipment as well as infrastructure. 

描述

Geobrugg delivered a 42m long, with 7m tall posts RXE-2000 Barrier at the end of December 2020. Project was completed, with great teamwork, January 2021.

国家/地区

加拿大

客户

工程:

Dr. Duncan Wyllie, P.Eng

防护对象

Mine / Quarry, Infrastructure, Other

腐蚀保护:

Galvanized, GEOBRUGG SUPERCOATING

本地联系方式

René Müller
   

René Müller

Country Manager Western Switzerland

自然災害防護
Hydraulic Engineering
矿井/隧道
Monitoring
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Western Switzerland

联系地址

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

自然災害防護
Hydraulic Engineering
矿井/隧道
Monitoring
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

自然災害防護
Hydraulic Engineering
矿井/隧道
Monitoring
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / 瑞士 Country Manager Southern Switzerland

联系地址