Switzerland
Switzerland

myGeobrugg

Slope Stability - Vallenar North Entrance 2020

General view with reinforcement

Slope Stability - Vallenar North Entrance 2020

Close-up spike plate and mesh

Slope Stability - Vallenar North Entrance 2020

The slope before stabilization

Slope Stability - Vallenar North Entrance 2020

Drilling of the anchors

Slope Stability - Vallenar North Entrance 2020

Border anchors

Slope Stability - Vallenar North Entrance 2020

Detail spike plate

Slope Stability - Vallenar North Entrance 2020

Protected road with stabilized slope

Slope Stability - Vallenar North Entrance 2020

Overview of the slope after the installation

 
 

Year of installation

2020

Situation

The northern entrance to the city of Vallenar is the principal transit route for all vehicles, buses, or trucks. 12'600 m² embankment along this road had to be stabilized.

Description

Today the slope is stabilized with mesh and spike plates fulfilling the official requirements.

Country/Region

Chile

Customer

Ministerio de obras publicas

Contractor

Ecopsa

Protected object

Road, Residential area

Corrosion protection

GEOBRUGG SUPERCOATING

Your local contact

René Müller
   

René Müller

Country Manager Western Switzerland

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Monitoring
Geobrugg AG,Industriestrasse 21,5200 Brugg / Switzerland Country Manager Western Switzerland

E-Mail

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Monitoring
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Monitoring
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / Switzerland Country Manager Southern Switzerland

E-Mail