瑞士
瑞士

myGeobrugg

Vallenar North Entrance

边坡稳定 - Vallenar North Entrance 2020

General view with reinforcement

边坡稳定 - Vallenar North Entrance 2020

Close-up spike plate and mesh

边坡稳定 - Vallenar North Entrance 2020

The slope before stabilization

边坡稳定 - Vallenar North Entrance 2020

Drilling of the anchors

边坡稳定 - Vallenar North Entrance 2020

Border anchors

边坡稳定 - Vallenar North Entrance 2020

Detail spike plate

边坡稳定 - Vallenar North Entrance 2020

Protected road with stabilized slope

边坡稳定 - Vallenar North Entrance 2020

Overview of the slope after the installation

 
 

安装年份:

2020

情况:

The northern entrance to the city of Vallenar is the principal transit route for all vehicles, buses, or trucks. 12'600 m² embankment along this road had to be stabilized.

描述

Today the slope is stabilized with mesh and spike plates fulfilling the official requirements.

国家/地区

智利

客户

Ministerio de obras publicas

承包商:

Ecopsa

防护对象

Road, Residential area

腐蚀保护:

GEOBRUGG SUPERCOATING

本地联系方式

René Müller
   

René Müller

Country Manager Western Switzerland

自然災害防護
Hydraulic Engineering
矿井/隧道
Monitoring
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Western Switzerland

联系地址

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

自然災害防護
Hydraulic Engineering
矿井/隧道
Monitoring
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

自然災害防護
Hydraulic Engineering
矿井/隧道
Monitoring
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / 瑞士 Country Manager Southern Switzerland

联系地址