Estabilização de taludes - Vallenar North Entrance 2020

General view with reinforcement

Estabilização de taludes - Vallenar North Entrance 2020

Close-up spike plate and mesh

Estabilização de taludes - Vallenar North Entrance 2020

The slope before stabilization

Estabilização de taludes - Vallenar North Entrance 2020

Drilling of the anchors

Estabilização de taludes - Vallenar North Entrance 2020

Border anchors

Estabilização de taludes - Vallenar North Entrance 2020

Detail spike plate

Estabilização de taludes - Vallenar North Entrance 2020

Protected road with stabilized slope

Estabilização de taludes - Vallenar North Entrance 2020

Overview of the slope after the installation

 
 

Ano de instalação:

2020

Situação:

The northern entrance to the city of Vallenar is the principal transit route for all vehicles, buses, or trucks. 12'600 m² embankment along this road had to be stabilized.

Descrição:

Today the slope is stabilized with mesh and spike plates fulfilling the official requirements.

País / Região:

Chile

Cliente:

Ministerio de obras publicas

Contratante:

Ecopsa

Objecto protegido:

Estrada, Área residencial

Protecção contra a corrosão:

GEOBRUGG SUPERCOATING

O seu contacto local

René Müller
   

René Müller

Country Manager Western Switzerland

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Monitoring
Geobrugg AG,Industriestrasse 21,5200 Brugg / Suíça Country Manager Western Switzerland

E-mail

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Monitoring
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Monitoring
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / Suíça Country Manager Southern Switzerland

E-mail