Suiza
Suiza

myGeobrugg

Puy-Sanières, Versant de Villaret

Estabilización de taludes - Puy-Sanières, Versant de Villaret 2024

Overall view of the slope

Estabilización de taludes - Puy-Sanières, Versant de Villaret 2024

Unstable zone before the slope was stabilized

Estabilización de taludes - Puy-Sanières, Versant de Villaret 2024

Overall view of the slope covered with mesh and erosion control mat

Estabilización de taludes - Puy-Sanières, Versant de Villaret 2024

Tunnel portal with the stabilized slopes

Estabilización de taludes - Puy-Sanières, Versant de Villaret 2024

Detail of TECCO GREEN G65/3 flexible panel with P33 claw plates

Estabilización de taludes - Puy-Sanières, Versant de Villaret 2024

Detail of TECCO GREEN G65/3 junction with TECCO G65/4 and TECMAT

 
 

Año de instalación:

2024

Situación

The exceptionally bad weather at the end of 2023 weakened the earthwork on the Villaret slope. As a result, train traffic was interrupted and then restricted for several months, and the Villaret slope had to undergo major reinforcement work.

Descripción

A nailed wall with a flexible facing reinforced the unstable overburden zone above the tunnel head. The structure combines more than 400 anchors with diameters of 28 mm and 32 mm, with depths ranging from three to twelve meters, and a flexible facing consisting of around 3,700 m² of TECCO mesh, supplemented by a TECMAT anti-erosion geogrid. In addition, two drainage groins were installed directly in the reprofiled ground before the mesh was put in place to drain the water resurgence observed at the top of the slope.

The work was completed in spring 2024, and the temporary speed limits (LTV) in place on the Villaret slope since December 2023 ended in July 2024 before the summer season started.

País / Región

Francia

Cliente

Ingeniería:

SNCF Réseau

Subcontratista:

Objeto protegido

Ferrocarril

Protección contra la corrosión

GEOBRUGG SUPERCOATING

Su contacto local

René Müller
   

René Müller

Country Manager Western Switzerland

Protección contra riesgos naturales
Ingeniería hidráulica
Minería / Túneles
Sistema de Monitoreo
Geobrugg AG,Industriestrasse 21,5200 Brugg / Suiza Country Manager Western Switzerland

Correo electrónico

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

Protección contra riesgos naturales
Ingeniería hidráulica
Minería / Túneles
Sistema de Monitoreo
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

Correo electrónico

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

Protección contra riesgos naturales
Ingeniería hidráulica
Minería / Túneles
Sistema de Monitoreo
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / Suiza Country Manager Southern Switzerland

Correo electrónico