スイス
スイス

myGeobrugg

Puy-Sanières, Versant de Villaret

 - Puy-Sanières, Versant de Villaret 2024

Overall view of the slope

 - Puy-Sanières, Versant de Villaret 2024

Unstable zone before the slope was stabilized

 - Puy-Sanières, Versant de Villaret 2024

Overall view of the slope covered with mesh and erosion control mat

 - Puy-Sanières, Versant de Villaret 2024

Tunnel portal with the stabilized slopes

 - Puy-Sanières, Versant de Villaret 2024

Detail of TECCO GREEN G65/3 flexible panel with P33 claw plates

 - Puy-Sanières, Versant de Villaret 2024

Detail of TECCO GREEN G65/3 junction with TECCO G65/4 and TECMAT

 
 

Year of installation

2024

Situation

The exceptionally bad weather at the end of 2023 weakened the earthwork on the Villaret slope. As a result, train traffic was interrupted and then restricted for several months, and the Villaret slope had to undergo major reinforcement work.

Description

A nailed wall with a flexible facing reinforced the unstable overburden zone above the tunnel head. The structure combines more than 400 anchors with diameters of 28 mm and 32 mm, with depths ranging from three to twelve meters, and a flexible facing consisting of around 3,700 m² of TECCO mesh, supplemented by a TECMAT anti-erosion geogrid. In addition, two drainage groins were installed directly in the reprofiled ground before the mesh was put in place to drain the water resurgence observed at the top of the slope.

The work was completed in spring 2024, and the temporary speed limits (LTV) in place on the Villaret slope since December 2023 ended in July 2024 before the summer season started.

Country/Region

フランス

Customer

Engineering

SNCF Réseau

Contractor

Protected object

鉄道

Corrosion protection

ジェオブルッグ スーパーコーティング

Your local contact

René Müller
   

René Müller

Country Manager Western Switzerland

自然災害防護
Hydraulic Engineering
鉱山/トンネル
モニタリングサービス
Geobrugg AG,Industriestrasse 21,5200 Brugg / スイス Country Manager Western Switzerland

E-Mail

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

自然災害防護
Hydraulic Engineering
鉱山/トンネル
モニタリングサービス
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

自然災害防護
Hydraulic Engineering
鉱山/トンネル
モニタリングサービス
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / スイス Country Manager Southern Switzerland

E-Mail