Svizzera
Svizzera

myGeobrugg

Consolidamento di versanti - Dawlish Central Tunnels 2024

Overhead view of the protected railway line and tunnel

Consolidamento di versanti - Dawlish Central Tunnels 2024

Slope stabilization work is in progress at Dawlish Central Tunnels. TECCO® G65/3 Stainless mesh has been installed to prevent rockfalls and soil erosion.

Consolidamento di versanti - Dawlish Central Tunnels 2024

View of the steep slope above the railway tunnel showing how the TECCO System seamlessly blended with the surroundings.

Consolidamento di versanti - Dawlish Central Tunnels 2024

Train passing through the tunnel with installed TECCO® STAINLESS mesh ensuring long-term slope stability and safety.

Consolidamento di versanti - Dawlish Central Tunnels 2024

Completed slope stabilization project

 
 

Anno di installazione:

2024

Situazione

Over the years, the slopes above the railway between Dawlish and Holcombe have experienced continuous failures, causing significant delays, closures, and operational challenges. 

The project aimed to address these challenges by combining multiple work areas to create a cohesive and effective protective system.

Descrizione

To ensure the stability of the slopes above the railway, we collaborated with Tony Gee and Partners to develop a robust and durable solution. The solution involved installing TECCO® G65/3 Stainless Steel mesh, known for its exceptional resistance to corrosion — a crucial factor given the challenging coastal environment of South West England.

Designed to provide protection for over 120 years, this system offers long-term security for the rail infrastructure. By utilizing compliant P33/50 and P66/50 stainless steel spike plates, Tony Gee and Partners were able to precisely model and design the stabilization system using our specialized RUVOLUM® software. This approach ensured optimal placement and performance, safeguarding the railway for future generations.

Paese / Regione

Regno Unito

Cliente

Progettazione:

Contraente:

BAM

Subappaltatore

Oggetto protetto

Ferrovia

Protezione dalla corrosione

INOX / STAINLESS

Il contatto locale

René Müller
   

René Müller

Country Manager Western Switzerland

Sistemi contro il dissesto idrogeologico
Ingegneria idraulica
Miniera / Gallerie
Sistema di monitoraggio da remoto
Geobrugg AG,Industriestrasse 21,5200 Brugg / Svizzera Country Manager Western Switzerland

E-mail

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

Sistemi contro il dissesto idrogeologico
Ingegneria idraulica
Miniera / Gallerie
Sistema di monitoraggio da remoto
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

Sistemi contro il dissesto idrogeologico
Ingegneria idraulica
Miniera / Gallerie
Sistema di monitoraggio da remoto
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / Svizzera Country Manager Southern Switzerland

E-mail