 - Municipal road 415 2008

After the debris flow event

 - Municipal road 415 2008

After the event

 - Municipal road 415 2008

disassembling of barrier and removal of debris

 - Municipal road 415 2008

Disassembling of barrier and removal of debris

 - Municipal road 415 2008

Reinstallation

 

Systems

 

Year of installation

2008

Situation

In 2008 thawing season, the drainage system of Municipal road 415 was blocked up, and therefore rock fragments were piled on the road because of the debris flow triggered by heavy rain.

The adequate protection system which provides porosity and permeability for dewatering and enables to filter out sediment was needed.

Description

Geobrugg debris flow barrier VX140-H4 was installed June 2008.

Debris flow event occurred July 2008 one month later after installation. 200m2 of boulders, rock fragments were retained.

The barrier has been reinstalled after removal of sediments. As any deformation had not been found on every part of the barrier system, there was no need for replacement.

Country/Region

韓国

Customer

-

Protected object

道路

Corrosion protection

ジェオブルッグ スーパーコーティング

Your local contact

René Müller
   

René Müller

Country Manager Western Switzerland

自然災害防護
Hydraulic Engineering
鉱山/トンネル
モニタリングサービス
Geobrugg AG,Industriestrasse 21,5200 Brugg / スイス Country Manager Western Switzerland

E-Mail

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

自然災害防護
Hydraulic Engineering
鉱山/トンネル
モニタリングサービス
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

自然災害防護
Hydraulic Engineering
鉱山/トンネル
モニタリングサービス
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / スイス Country Manager Southern Switzerland

E-Mail