泥石流和滑坡防护 - Municipal road 415 2008

After the debris flow event

泥石流和滑坡防护 - Municipal road 415 2008

After the event

泥石流和滑坡防护 - Municipal road 415 2008

disassembling of barrier and removal of debris

泥石流和滑坡防护 - Municipal road 415 2008

Disassembling of barrier and removal of debris

泥石流和滑坡防护 - Municipal road 415 2008

Reinstallation

 

系统

 

安装年份:

2008

情况:

In 2008 thawing season, the drainage system of Municipal road 415 was blocked up, and therefore rock fragments were piled on the road because of the debris flow triggered by heavy rain.

The adequate protection system which provides porosity and permeability for dewatering and enables to filter out sediment was needed.

描述

Geobrugg debris flow barrier VX140-H4 was installed June 2008.

Debris flow event occurred July 2008 one month later after installation. 200m2 of boulders, rock fragments were retained.

The barrier has been reinstalled after removal of sediments. As any deformation had not been found on every part of the barrier system, there was no need for replacement.

国家/地区

韩国

客户

-

防护对象

Road

腐蚀保护:

GEOBRUGG SUPERCOATING

本地联系方式

René Müller
   

René Müller

Country Manager Western Switzerland

自然災害防護
Hydraulic Engineering
矿井/隧道
Monitoring
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Western Switzerland

联系地址

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

自然災害防護
Hydraulic Engineering
矿井/隧道
Monitoring
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

自然災害防護
Hydraulic Engineering
矿井/隧道
Monitoring
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / 瑞士 Country Manager Southern Switzerland

联系地址